Skip to content
LKMD Construction — …Innovating Tomorrow, Engineering Today

Project

Athlone Girls High School – Johannesburg

LKMD Construction refurbished existing buildings and built new facilities at Athlone Girls High School in Johannesburg, Gauteng.

Key facts

Client
Gauteng Department of Infrastructure Development
Location
Observatory, Johannesburg, Gauteng
Sector
Education
Services
Building Construction · Refurbishment, Renovation & Maintenance
Our role
Executed the works on behalf of Temi Construction
Year(s)
2023–2024
Status
Completed

LKMD Construction refurbished existing buildings and built new facilities at Athlone Girls High School in Johannesburg, Gauteng.

Johannesburg, Gauteng

Athlone Girls High School is a public secondary school in Observatory, Johannesburg. The project, carried out for the Gauteng Department of Infrastructure Development, upgraded the school’s existing buildings and added new facilities for learners and staff.

Our scope

  • Refurbishment of the existing school buildings
  • A new classroom block
  • A school hall
  • Administration offices
  • A media centre and laboratories
  • Toilet facilities
  • Sports facilities

The outcome

A fully functioning school was handed over in 2024.

Photographs

Overhead view of the school’s tiled roofs around the planted central quadrangle.
Aerial view of Athlone Girls High School showing the classroom wings, sports courts and playing field, with jacarandas in flower.
Aerial view of the school and its tennis courts among the surrounding suburb.
The school grounds from above, with the playing field, courts and jacarandas in flower.
Aerial view of the campus, its classroom wings set among mature trees and neighbouring houses.
Overhead view of the quadrangle enclosed by the school’s pitched tile roofs.
A two-storey classroom block with its steel windows, seen across the courts.
The courtyard looking along the arched colonnades that enclose it on all sides.
The arcade running alongside the classrooms, with brick piers and a tiled floor.
A covered walkway between classroom blocks leading to an entrance.
Refurbished washroom with new basins, mixers, mirrors and tiling against the retained face brick.
A path alongside the classroom windows, with the covered walkway beyond.
The quadrangle at ground level, showing the face brick arcade, the roof cupola and the planted courtyard.
Face brick elevation with the louvred roof cupola above the tiled roof.
The covered walkway running beside the quadrangle, with brick piers, arched openings and a quarry tile floor.

Looking for an expert team to manage your construction requirements?

Get in touch with LKMD today. Tell us what you need built and where, and we will be delighted to help.

Start a projectSee our projects